Case Studies

Projects across new construction, retrofit, and portfolio-scale treatment.

Prismaclad works directly with developers and their design teams — from single-building facade requirements to coordinated rollouts across a development pipeline.

New Construction

Regional Data Center Campus — Loudoun County, VA

Geometric exterior pattern applied to a 450,000 sq ft tilt-up concrete campus to satisfy Loudoun County's "attractive architectural features" requirement. Design developed from survey data and approved in a single review cycle.

Read Case Study
Read Case Study
1 cycle
Approved in one review
450K
Sq ft treated
Case study hero image showing stakeholder trust initiative results for GreenField Consumer Brands
Retrofit — Occupied Site

Industrial Logistics Facility — Phoenix, AZ

Vinyl-applied treatment to a standing 200,000 sq ft distribution facility with active operations. Installation completed over four weekends without operational downtime.

Read Case Study
Read Case Study
0
Operational downtime
200K
Sq ft treated
Case study hero image showing CSRD compliance program results for Apex Industrial Holdings
Portfolio Scale

Data Center Portfolio — Mid-Atlantic, 6 Sites

Coordinated facade treatment across 6 data center assets for a single developer. Consistent design language across sites with county-specific ordinance adaptations at each location.

Read Case Study
Read Case Study
6
Sites, consistent design
1
Shared delivery timeline
Case study hero image showing net zero roadmap transformation for industrial company
New Construction

Hyperscale Campus — DeKalb County, GA

Painted exterior treatment on a 1.2M sq ft hyperscale campus. Design coordinated with the developer's architecture team and submitted as part of the county's design review package.

Read Case Study
Read Case Study
1.2M
Sq ft treated
1
County design package included
Case study hero image showing CSRD-ready reporting framework implementation results
Retrofit

Industrial Campus Retrofit — Prince William County, VA

Geometric and textural pattern treatment on a 320,000 sq ft existing industrial facility, applied to the primary public-facing elevation per ordinance requirements.

Read Case Study
Read Case Study
320K
Sq ft treated
1
Elevation, ordinance satisfied
Prismaclad facade treatment on data center campus — project case study
Frequently Asked Questions

Common Questions & Answers

What developers and project teams typically ask before engaging Prismaclad.

Prismaclad designs, produces, and installs large-scale painted and vinyl exterior treatments for data centers and industrial buildings. We handle the full process from site survey through installation under one contract.

We work on tilt-up concrete, metal panel, and masonry exterior structures. Both new construction (design can begin at permit stage) and standing buildings (including occupied sites). Scale ranges from single buildings to developer portfolios.

Tilt-up concrete, metal panel, and masonry exterior surfaces. Both smooth and textured. We'll confirm compatibility at the site survey stage.

Survey to installed treatment typically runs 10–16 weeks depending on site complexity and production schedule. Portfolio-scale projects are sequenced to match your development timeline.

Still have questions?

We’re here to provide clarity and assist with any queries you may have.

Get in Touch
Get in Touch

Ready to transform your project?

One site or a full portfolio, new construction or already standing — every project starts with a conversation.

Get in touch
Get in touch
Black and white image of a rock arch formation with layered canyon cliffs in the background.